BZN’s arrivals curb renovation was part of the
$9.3-million parking expansion that opened just in time for holiday travel. Our arrivals curb, now triple in size and extending the length of the
terminal, allows customers to pick up their guests with ease. Prior to
expansion, our arrivals curb only accommodated 12 vehicles. BZN’s arrivals curb can now
handle 45-50 vehicles at a time.
In order to conduct an expansion of this magnitude, the arrivals
curb needed to be relocated further from the main terminal exits. The limited amount of
space in the former arrivals area was not conducive for a 3-lane wide expansion. Walkways are available for
passengers to safely make their way from the terminal to the new arrivals curb.
Travelers will now find their shuttle, bus, and taxi rides located directly in
front of the terminal. For an updated map of the curb front area, please click
here.
Construction will continue through spring of 2023; large
scale signage will be posted, entry and road ways will be adjusted, and
finishing touches still need to be completed. BZN would like to thank customers
for their patience throughout the transition to further improve and
expand the airport’s infrastructure.